DHW monitoring – month- year-

-01-2024-
until 2023 -07-2023- -08-2023- 09-2023 -10-2023- -11-2023- -12-2023-

 

.

 

Additional Information service-related hot water

toc- Towel dryer measured by sensor installed at the entrance of the pipeline to the bathroom, maximally protected from the effects of room temperature.

toc Towel dryer and hot water have a correlation equal to 4 to 6 degrees, upon measurement 4 degrees, added +2 degrees stock.

On the basis of the above to c hot water does not exceed 42,7about + 4about Actual and established indicators of heating supply and 46,7about +2 Actual and established indicators of heating supply and 48,7about

Due to the transfer of heat from hot water to plumbing elements and the discharge of hot water into the sewer during measurement, measured through a temperature sensor carried out – when measuring to c correlation additive is used – (Kd=40) to the sensor readings of the p/dryer -(PS) Then: Hot water temperature – (GW) equal – GV=PS + CD. Hot water sensor is disabled, in the future it will be used to accurately determine the temperature of hot water with the addition of the value CD.
Monitoring of hot water supply, apartment 4, building 40b
.

 

01.09.2023 – 30.09.2023

Explanation of temperature measurements

t average for 09.2023.: (43,8+43,1+43,3+41,3+42,2+41,75+40,56+40,13+40,44+40,5+40,3+40,5+40,95+34,1+40,47+34,6+40,6+40,78)/18 Actual and established indicators of heating supply and 42,52about
t among = 40,78

t among = 40,60

18.09.2023 13:40, hot water turned off, 18.09.2023 19:00, hot water included

t among = 40,47

t among = 34,60

16.09.2023 24:10, hot water turned off16.09.2023 15:45, turned on hot water
t among = 34,10

t among = 40,50

t among = 40,95

t among = 40,50

t among = 40,30

t among = 40,44

t among = 40,56

t among = 40,13

t among = 42,20

t among = 41,75

t among = 43,30

 

t among = 41,9

t among = 43,80

t among = 43,1

.

 

01.08.2023 – 31.08.2023

Explanation of temperature measurements

15.08.2023 15:30, hot water turned off 31.08.2023 17:00, hot water included (no hot water supply 16 days)
17:00, 31.08.2023 A.G. Miller deigned to include DHW in house 40b, in house 40a hot water supply is included 16:00, 30.08.2023, heat point shared by two houses. YES. Shmihal, V.V. Klitschko, V.V. Grigorenko like an accident on the housing and communal services pipeline No. 7 duration 15 days, and 10 summer DHW temperature regime below 50 degrees, random DHW shutdowns – corresponds Legal acts of the state of Ukraine ???
No hot water 29.08.2023, 09:53 appeal . on tel.044-500-15-57, otv. operator Nadezhda – question asked – why is there no hot water in the house 40b st. Klavdievskaya. Reply. pipeline accident, without water 58 houses, time for repairs has been set until 19:00, 29.08.2023
Heat point for two houses 40a and 40b in house 40a in 20:37 21.08.2023 the first signs of rusty hot water appeared, t which is approximately 30about. then the hot water was turned off in dome 40b hot water did not turn on at all, temperature and other legal order in the house depends on desire Monarch A.G.. Miller. This attack monarchy in house 40b it’s time to stop due to violation of Ukrainian regulations, do this by transferring house 40b to a full-fledged Manager.
No hot water on 19.08.2023 r. – 8:00 dispatcher information 044-500-1577 “Svetlana”, the time for repairs in the area of ​​the territory of housing and communal services No. 7 has been extended for a new period until 20:00, 21.08.2023r. In connection with the response received, more accurate information requested repair coordinates – Street name, number of the nearest house from the accident site, “Svetka” passed out. This request was accepted by another dispatcher when calling again 044-500-1577 Only 08/21/2023. information was received for a new request, that work is being carried out in the Heat Chamber according to Bulakhovsky Xx, DHW will be supplied 21.08.2023, 20:00
Hot water turned off 15.08.2023 of the year 13:30 to 20:00, 18.08.2023 according to the dispatcher 044-500-1557,. cause of pipeline breakthrough on the territory of housing complex No. 7, 33 home without hot water. According to the Concierge (“Dispatcher” Houses40b??? he is. Klavdievskaya) water is turned off until 08/23/2023. There are no advertisements in official designated places for their placement.
.

 

01.07.2023 – 31.07.2023

Explanation of temperature measurements

.

.

 

u7 – Hot water monitoring (MGV) (The established norm is from 50° to 75°, Average temperature – normal service = 62.5°)
Current hot water parameters mmonths. Disabling DHW
Total household expenses and cost of hot water per month
 

Date

 

Time

T=C°

fact

Photo

Monitoring of the supply of KP KHPP heating until 07.01.22. Monitoring of hot water supply to KP KHPP until 07.01.22. Heating and hot water service provider KP-KHPP - Municipal enterprise "Kyivteploenergo" m-4k4

 

Ex

 

incl

Consumption

common house m3

 

sq. house m3

General

sum. hryvnias

 

Debtors

05.01.22 10:04 50,5 Monitoring of the supply of KP KHPP heating until 07.01.22. Monitoring of hot water supply to KP KHPP until 07.01.22. Heating and hot water service provider KP-KHPP - Municipal enterprise "Kyivteploenergo" m-4k4
19.12.21 8:45 49 Monitoring of the supply of KP KHPP heating until 07.01.22. Monitoring of hot water supply to KP KHPP until 07.01.22. Heating and hot water service provider KP-KHPP - Municipal enterprise "Kyivteploenergo" m-4k4
05.12.21 10:36 49 Monitoring of the supply of KP KHPP heating until 07.01.22. Monitoring of hot water supply to KP KHPP until 07.01.22. Heating and hot water service provider KP-KHPP - Municipal enterprise "Kyivteploenergo" m-4k4
10.11.21 9:19 49 Rusty
08.11.21 7:57 49 Rusty
29.10.21 7:34 49,5 Rusty
27.10.21 8:27 49 Rusty
06.10.21 10:26 49 Photo Note
03.10.21 9:00 9:00
25.09.21 15:00 No hot water
19.09.21 10:57 53 Rusty
15.09.21 8:44 47 Rusty
14.09.21 9:16 51 Photo
11.09.21 8:30
09.09.21 16:00 No hot water
09:09.21 48 Rusty
07.09.21 09:00
01.09.21 17:30
No hot water
29.08.21 09:57 47 Rusty
27.07.21 by 27.08.21 No hot water
12.07.21 by 26.07.21 Kievteploenergo disconnected for hydraulic testing.
09.07.21 06:39

07:39

08:39

49

50

48

Rusty

Rusty

Rusty

03.06.21 11:19 48 Rusty
01.07.21 12:00 00,00 12:00 16:30 .incl. 02.06.21
31.05.21 10:54 34 Photo
27.05.21 09:30 Photo
18.05.21 10:53 33,5 Photo
13.05.21 07:58 32 Photo
06.05.21 10:23 35 Photo
03.05.21 10:30 32 Photo
27.04.21 09:32 35 Photo
23.04.21 09:34 39 Photo
22.04.21 10:27 42 Rusty
21,04.21 No water No water Rjav, Rjav 20:00
20.04.21 No water No water 15:00 19:00
29.03.21 11:10 43 Photo
20.03.2021 12:35 43 Rusty
19.03.2021 10:00 12:00
14.03.2021 10:21 49 Photo
04.03.2021 10:31 50 Photo
26.02.2021 08:47 49 Photo
22.02.2021 11:47 54 Rusty 13:00 in address-
Ep: 1(3once),2,3 22.02.2021 link to u7
13.02.2021 10:55 53 Rusty
08.02.2021 10:27 54 Rusty ХВС фоt etal CT scan 16:19 08.02.2021 link to u7
06.02.2021 06:00 0 06.00 16:00 06.02.2021 incl
05.02.2021 08:51 53 Rusty
.30.01.2021 17:41 57 Rusty
28.01.2021 08.57 57 Rusty
26.01.2021 12:11 54 Rusty
25.01.2021 22:30 0 22:30 10:30 26.01.2021 incl CT scan 8:30 26.01.2021 link to u7
21.01.2021 10:50 46 Rusty
.19.01.2021 4:00 0 4:00 11:00
18.01.2021 17:45 65 Sl.rusty
05.01.2021 11:19 52 Thumbnail
30.12.2020 22:34 0 reference
28.12.2020 8:51 57 Sl.rusty
27.12.2020 06.23 42 Rusty Note
19.12.2020 11:20 52 Sl.rust
13.12.2020 10;00 43 Rusty
07.12.2020 10:00 47 Sl.rust
06.12.2020 10:00 45 Sl. rust
30.11.2020 10:00 44 Rusty
26.11.2020 10:00 44 Rusty
22.11.2020 10:00 41 Rusty
16.11.2020
10:00
43
Rusty
12.11.2020 10:00 44
28.05.2020 21:35 25 Note

 